Public Notices Overview

A Public Notice is prepared as the primary method of advising all interested parties of a proposed activity for which a permit is sought and of soliciting comments and information necessary to evaluate the probable beneficial and detrimental impacts on the public interest.  Public notices are only prepared for projects determined to exceed minimal individual or cumulative adverse environmental effects and that may be contrary to the public interest.

Submitting Comments:

To send email comments to the respective Project Manager, click on the Project Manager's name below, or contact the Regulatory Branch, U.S. Army Corps of Engineers, Baltimore District, 2 Hopkins Plaza., Baltimore, MD 21201. Comments made in reference to a Public Notice should include your name, address, and phone number. Please be sure to include the Public Notice Number or the Application Number on all correspondence to the District.

Join Our Mailing List!

If you are interested in receiving public notices as part of our mailing list, please fill out the form here and we will add you to our database.

Results:
Tag: Tar Bay
Clear
  • PN 21-22 NAB-2020-62029 (Sadler, Jerome/Breakwater and Groin)

    Expiration date: 7/21/2021

    Comment Period: June 21, 2021 to July 21, 2021. PURPOSE: Construct a 40’ x 11’ stone groin to the west and 45’ x 11’ stone groin to the east by depositing 990 cubic yards of stone, to extend no more than 50 feet channelward of the approximate mean high water (MHW) shoreline; to construct a 70-foot long by 14-foot wide breakwater by depositing 910 cubic yards of stone, to extend no more than 45 feet channelward of the approximate MHW shoreline. The proposed groin on the east side would impact approximately 25 square feet of mapped SAV from 2015-2019.