Home > Missions > Regulatory > Public Notices

Public Notices Overview

A Public Notice is prepared as the primary method of advising all interested parties of a proposed activity for which a permit is sought and of soliciting comments and information necessary to evaluate the probable beneficial and detrimental impacts on the public interest.  Public notices are only prepared for projects determined to exceed minimal individual or cumulative adverse environmental effects and that may be contrary to the public interest.



Submitting Comments:

To send email comments to the respective Project Manager, click on the Project Manager's name below, or contact the Regulatory Branch, U.S. Army Corps of Engineers, Baltimore District, 2 Hopkins Plaza., Baltimore, MD 21201. Comments made in reference to a Public Notice should include your name, address, and phone number. Please be sure to include the Public Notice Number or the Application Number on all correspondence to the District.

If you are trying to access a public notice prior to 2013, please email us here.

Join Our Mailing List!

If you are interested in receiving public notices as part of our mailing list, please fill out the form here and we will add you to our database.

1 ... 7 8 9 10 11 12 13 14 15 16

FILTER:
2016




SPN16-07 Information to Assist in Compliance with Nationwide Permit General Condition 18, Endangered Species - 1/29/2016: SPN16-07 the comment period is January 29, 2016 - Nationwide Permit: General Condition 18 Information. The purpose of this document is to provide information for prospective users of the Nationwide Permits (NWPs) that are not federal agencies to help them determine whether a proposed NWP activity requires a pre-construction notification (PCN) to ensure compliance with the Endangered Species Act (ESA). For the 2012 NWPs, ESA Section 7 compliance is covered by NWP General Condition 18. POC: Ms. Beth Bachur @ 410-962-4336 or by email beth.bachur@usace.army.mil
Expiration date:


PN16-06 (MDNR/Fisheries Service/Man O'War Shoal Shell Dredging) - 2009-61802-M04 - 1/27/2016: THE PURPOSE OF THIS PUBLIC NOTICE IS TO ADVISE THAT BOTH OF THE CORPS/MARYLAND DEPARTMENT OF THE ENVIRONMENT PUBLIC HEARINGS ON THE SUBJECT APPLICATION HAVE BEEN RESCHEDULED DUE TO THE WINTER STORM. AT THIS TIME, NO DECISION HAS BEEN MADE AS TO WHETHER OR NOT AUTHORIZATIONS WILL BE ISSUED. FOR ADDITIONAL INFORMATION ON THIS PROJECT REFERENCE PN15-89.
Expiration date: 2/29/2016


SPN16-05 Maryland State Programmatic General Permit - 5 - 1/22/2016: SPN16-05 the comment period is January 22, 2016 to March 07, 2016 - The MDSPGP-5 is a modification of the MDSPGP-4 that includes proposed substantive modifications consisting of the inclusion of temporary construction impacts into the description and thresholds for several activities reducing the need to use multiple MDSPGP-5 activities for a single and complete project stacking; a new maximum total (temporary and permanent) acreage impact threshold for Category A of Activity b(1), General Maintenance activity; the addition of two new activities for culvert pipe grouting and stormwater management activities; elimination of Activity e(6), Special Area Management Plan (SAMP) Study Area Projects, and the clarification of definitions and compensatory mitigation within the MDSPGP-5. THERE IS A PUBLIC HEARING SCHEDULED FOR FEBRUARY 24, 2016. REF PAGE 12 FOR FURTHER DETAILS. POC: Ms. Beth Bachur @ 410-962-4336 or by email beth.bachur@usace.army.mil or POC: Steve Elinsky @ 410-962-4503 or by email steve.elinsky@usace.army.mil
Expiration date: 3/7/2016


PN16-04 (Wisner, Eric/Aquaculture Lease #267) - 2015-01561 - Wicomico County - 1/11/2016: PN 16-04 the comment period is January 11, 2016 to February 11, 2016 – Wicomico County DESCRIPTION: To establish 69.9 acres of suitable substrate for the commercial production of oyster shellfish. POC: Eugene Morgenthaler 410-820-8629 or by email eugene.j.morgenthaler@usace.army.mil
Expiration date: 2/11/2016


PN16-03 (Blount, Ronald) - 2015-61652 - Worcester County - 1/5/2016: PN16-03 the comment period is January 5, 2016 to January 25, 2016 – Worcester County DESCRIPTION: To construct a walkway connecting pier and to install a sand canoe launching walkway. POC: Mrs. Laura Coleman 443-853-2051 or via email at Lamuelle.l.coleman@usace.army.mil
Expiration date: 1/5/2016