Baltimore Harbor maintenance dredging
Dredged material is removed via clamshell dredge and transported by barge to respective placement sites as part of of maintenance dredging of channels associated with the Baltimore Harbor and Channels Project.

Download Image: Full Size (2.57 MB)
Photo by: Christopher Gardner  |  VIRIN: 231220-O-ZP796-3276.JPG