Public Notice
Baltimore District Published: June 10, 2026
Permit Application Expires: July 10, 2026
No. NAB-2024-60129-M53
PN-26-17

Interested parties are hereby notified that the United States Army Corps of Engineers (USACE), Baltimore District has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. § 1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. § 403). The purpose of this public notice is to solicit comments from the public and information necessary to evaluate the probable impact on the public interest regarding the proposed activity as described below and as shown on the enclosed drawings.
PROPOSED ACTIVITY: The applicant is requesting a Department of the Army permit to improve the existing marina and boat ramp at the Shad Landing Marina. Proposed improvements include replacement and reconfiguration of the fixed piers with floating piers, replacement of the existing boat launch, installation of a stone revetment, a kayak launch and boat lifts. The maximum distance channelward from the approximate mean high water shoreline is 100 feet.
MITIGATION: The applicant has provided the following information to explain how impacts to WOTUS associated with the proposed activity would be avoided, minimized, and compensated for:
Avoidance/Minimization: All proposed marina improvements are located within or immediately adjacent to the existing in-water footprint, relying on previously disturbed aquatic resource to avoid new tidal open-water impacts. The impacts primarily consist of replacing and upgrading existing waterfront structures, including converting the existing fixed piers to floating piers, replacement of a boat ramp, Americans with Disabilities Act accessibility improvements, utility upgrades, and installation of updated marina facilities.
Alternative layouts and construction approaches were considered during project development; however, the selected design was determined to be the least environmentally damaging practicable alternative due to site constraints, navigational and accessibility requirements, resiliency needs, and the need to maintain marina operations and public (including Americans with Disabilities Act) access while remaining within the existing marina footprint. The use of floating piers improves long-term resiliency to tidal fluctuations and sea level rise, while minimizing permanent impacts to the river. Impacts associated with construction activities will be minimized through implementation of erosion and sediment control measures, the use of a coffer dam for dewatering during boat ramp replacement, and adherence to all applicable permit conditions.
Compensation: No compensatory mitigation is proposed because the project is limited to replacement and upgrade of existing marina structures within previously impacted aquatic areas, and no net loss of aquatic resource area or function is anticipated.
The USACE will determine the type and amount of compensatory mitigation necessary to offset losses of waters of the United States which may result from the proposed activity in accordance with 33 CFR § 332.
HISTORIC PROPERTIES/CULTURAL RESOURCES: Section 106 of the National Historic Preservation Act of 1966, as amended (54 U.S.C. § 306108), requires federal agencies to consult with the appropriate State and/or Tribal Historic Preservation Officers to take into account the effects of actions they undertake or permit on historic properties listed in or eligible for listing in the National Register of Historic Places.
The USACE is evaluating the undertaking for effects to historic properties as required under Section 106 of the National Historic Preservation Act. This public notice serves to inform the public of the proposed undertaking and invites comments including those from local, state, and federal government agencies with respect to historic resources.
The USACEs final eligibility and effect determination relative to historic resource impacts may be subject to additional coordination with the State Historic Preservation Officer, federally recognized tribes, and other interested parties, and with full consideration given to the proposed undertaking’s potential direct and indirect effects on historic properties within the USACE-identified permit area.
ENDANGERED SPECIES: Section 7 of the Endangered Species Act (16 U.S.C. § 1536) requires federal agencies to consult with the National Marine Fisheries Service and/or United States Fish and Wildlife Service on all actions that may affect a species listed (or proposed for listing) under the Endangered Species Act as threatened or endangered or that may adversely modify designated critical habitat (or critical habitat proposed such designation).
USACEs preliminary review indicates the described activity will have no effect on any threatened or endangered species or designated critical habitat. USACE will consider comments from this public notice, including any comments provided by the National Marine Fisheries Service and/or United States Fish and Wildlife Service, regarding the need to consult.
This notice serves as request to the United States Fish and Wildlife Service for any additional information on whether any listed or proposed to be listed endangered or threatened species or critical habitat may be present in the area which would be affected by the proposed activity.
NAVIGATION: The proposed structure or activity is located in the vicinity of a federal navigation channel.
Based on information provided by the applicant, there are several areas where the proposed pier structures encroach into the 25-foot minimum setback prescribed for Shad Landing Federal Channel, however none of the pier structures encroach into the federal channel limits.
SECTION 408: The applicant will not require permission under Section 14 of the Rivers and Harbors Act of 1899 (33 U.S.C. § 408) because the activity, in whole or in part, would not alter, occupy, or use a USACE Civil Works project.
WATER QUALITY CERTIFICATION: An Individual Water Quality Certification may be required from the Maryland Department of the Environment pursuant to Section 401 of the Clean Water Act (33 U.S.C. § 1341).
COASTAL ZONE MANAGEMENT: A federal consistency decision may be required from the State of Maryland pursuant to Section 307 of the Coastal Zone Management Act of 1972 (16 U.S.C. § 1451). A permit for the described work will not be issued until a consistency decision has been issued from the State of Maryland, if required.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The geographic extent of aquatic resources within the proposed project area that either are, or are presumed to be, within the USACE jurisdiction has not been verified by USACE personnel.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, aesthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
COMMENTS: The USACE is soliciting comments from the public; federal, state, and local agencies and officials; Tribal Nations; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the USACE to determine whether to issue, modify, condition, or deny a permit for this proposed activity. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Any comments or objections which are received during this period may be forwarded to the applicant for possible resolution before the determination is made whether to issue or deny the requested permit. Please note that all comments received will become part of the administrative record and are subject to public release under the Freedom of Information Act.
Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Requests for a public hearing will be granted, unless the District Engineer determines that the issues raised are insubstantial or there is otherwise no valid interest to be served by a hearing.
The Baltimore District will receive written comments on the proposed activity, as outlined above, until July 10, 2026. Comments should be submitted electronically via the Regulatory Request System at https://rrs.usace.army.mil/rrs/public-notices. The USACE point of contact for this project is Ms. Jaclyn Kelleher at jaclyn.k.kelleher@usace.army.mil.