Regulatory Correspondence

Please submit any correspondence, including compliance certification forms, via email at

NAB-Regulatory@usace.army.mil

or via mail:

U.S. Army Corps of Engineers, Baltimore District
Regulatory Branch (CENAB-OPR)
2 Hopkins Plaza
Baltimore, MD 21201

Customer Service Survey

We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers and would like to know how well we have been doing. 

To access the survey, click here.

Public Notices Overview

A Public Notice is prepared as the primary method of advising all interested parties of a proposed activity for which a permit is sought and of soliciting comments and information necessary to evaluate the probable beneficial and detrimental impacts on the public interest.  Public notices are only prepared for projects determined to exceed minimal individual or cumulative adverse environmental effects and that may be contrary to the public interest.

Submitting Comments:

To send email comments to the respective Project Manager, click on the Project Manager's name below, or contact the Regulatory Branch, U.S. Army Corps of Engineers, Baltimore District, 2 Hopkins Plaza., Baltimore, MD 21201. Comments made in reference to a Public Notice should include your name, address, and phone number. Please be sure to include the Public Notice Number or the Application Number on all correspondence to the District.

Join Our Mailing List!

If you are interested in receiving public notices as part of our mailing list, please fill out the form here and we will add you to our database.

Results:
Tag: public notice
Clear
  • PN 16-59 Comment period extended for MTA/Purple Line

    Expiration date: 12/2/2016

    2016-61278-M07 MDE, Nontidal Wetlands and Waterways 201661278/16-NT-0297/AI153609 MD DNR CASE NUMBER FCA S14-07 - 11/2/2016: The purpose of PN16-59 is to announce the extension of the MTA/Purple Line public notice comment period until Dec. 2, 2016. DESCRIPTION: MTA proposes to construct a 16.2-mile light-rail transit line, known as the Purple Line, from Bethesda Metro Station in Montgomery County to New Carrollton Station in Prince George’s County, Maryland. POC: Maria Teresi @ 410-962-4501 or by email maria.teresi@usace.army.mil.

  • Special PN #16-47

    The purpose of this special public notice is to inform the general public of the Baltimore District, U.S. Army Corps of Engineers (Corps) decision to reinstate the suspended 2012 Nationwide Permit #48 (NWP #48) with revised regional conditions for new and existing commercial shellfish aquaculture activities in Maryland tidal waters. NWP #48 will replace the expiring Regional General Permit-1 (RGP-1) for commercial aquaculture activities. An enclosure to this public notice (Enclosure 1) lists the revised regional conditions applicable to NWP #48 activities in Maryland waters. The reinstated 2012 NWP #48 with revised regional conditions will become effective in Maryland waters on August 16, 2016.

  • PN15-88 (MD DNR Chesapeake Bay Artificial Reefs) - 2015-60904

    Expiration date: 1/31/2016

    The comment period is December 10, 2015, to January 10, 2016. DESCRIPTION: To continue placing reef material at the 21 existing artificial fish reef sites in the Chesapeake Bay from Pooles Island south to Tangier Sound, throughout Maryland waters. POC: Mr. Rod Schwarm at (410) 820-8550 or by email rodney.d.schwarm@usace.army.mil.

  • PN 09-07 Curwensville Lake Project, Clearfield County, Pa.

    Expiration date: 9/9/2015

    The Baltimore District is examining ways to more effectively use water supply storage owned by the Susquehanna River Basin Commission at Curwensville Lake through modifications to the current water release operations plan. This investigation is at the request of the SRBC. Modified releases could help offset downstream consumptive water use during dry years and support stream ecosystem flow needs as determined by The Nature Conservancy.

  • PN 23-06 Chesapeake Bay Oyster Recovery Project, Tred Avon River, Maryland

    Expiration date: 8/21/2015

    Public comments will be accepted from June 23, 2015 to July 24, 2015. The Baltimore District is expanding the scope of the supplemental environmental assessment (EA) for Tred Avon River oyster restoration initiated in 2013 to include planting of disease-free spat-on-shell, or oyster seed, from state-owned hatcheries, on new oyster reefs between 6 and 9 ft mean lower low water (MLLW), and on existing reefs/natural oyster bars between 4 and 20 ft MLLW. Planting of spat-on-shell will add minimal change to the existing height of the natural oyster reefs and will increase the proposed project area by an additional 71 acres.

Regulatory Documents

 Title