East Coast maritime response assets remobilize EVER FORWARD
The U.S. Army Corps of Engineers, Baltimore District’s CATLETT navigates past the Francis Scott Key Bridge to perform a hydrographic survey at the Craighill Channel near Annapolis, Md., April 20, 2022. The District’s Survey team mobilized to the Chesapeake Bay to determine if sediments impacted the federal channel, resulting from the box ship EVER FORWARD’s recent grounding incident and successful refloating operations. (U.S. Army photo by Greg Nash)