CAP 205 projects focus mostly on local projects which could include structural solutions such as channel enlargement, realignment, or paving; obstruction removal; levee and wall construction; bank stabilization; and/or non-structural solutions such as a flood warning system. This floodwall is designed to be placed across a road during a high water event and is an example of a CAP 205 structural project.