140920-A-CE999-104
Crews staged and assembled the crane in the project area's parking lot at American University, near Watkins Hall, Sept. 20. The crane passed the load test, demonstrating it will be able to move the Engineering Control Structure (ECS).

Download Image: Full Size (1.12 MB)
Photo by: Courtesy |  VIRIN: 140920-A-CE999-104.JPG