SM-1 Reactor Construction at Fort Belvoir
Undated - Technicians set the core structure for the Army Package Power Reactor. At this stage, the reactor plant was 96 percent complete.(Photo courtesy of the Office of History)

Download Image: Full Size (0.8 MB)
Tags:
Photo by: File Photo |  VIRIN: 180119-A-WZ074-001.JPG