Corps of Engineers to complete $29 million in Baltimore Harbor and Channels dredging
All dredged material from the Baltimore Harbor and Channels will be removed via clamshell dredge and transported by barge to the respective placement sites. The material being removed consists primarily of mud, silt, sand, shell, and mixtures thereof.

Download Image: Full Size (2.57 MB)
Photo by: Christopher Gardner  |  VIRIN: 231220-O-ZP796-3276.JPG