PN17-38 (Arundel on the Bay/Shore Erosion Protection) - 2017-60396 - AA Co.

Published Aug. 4, 2017
Expiration date: 8/4/2017

       

 

 

                                                       Public Notice

U.S. Army Corps             In Reply to Application Number

of Engineers                   CENAB-OPR-MN (ARUNDEL ON THE BAY/ SHORE EROSION

Baltimore District            PROTECTION) 2017-60396-M18

 

PN 17-38                          Comment Period: August 4, 2017 to September 4, 2017

 


THE PURPOSE OF THIS PUBLIC NOTICE IS TO SOLICIT COMMENTS FROM THE PUBLIC REGARDING THE WORK DESCRIBED BELOW.  NO DECISION HAS BEEN MADE AS TO WHETHER OR NOT A PERMIT WILL BE ISSUED AT THIS TIME.

 

This District has received an application for a Department of the Army permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act (33. U.S.C. 1344) as described below:

 

APPLICANT:       Mr. David J. Delia

                            Arundel on the Bay, Inc.

                            P.O. Box 4665

                            Annapolis, Maryland 21403

 

WATERWAY AND LOCATION: The proposed project is located in Fishing Creek within the community of Arundel on the Bay, 1345 Magnolia Avenue, Annapolis, Anne Arundel County, Maryland.

 

PROPOSED WORK:

     1.   To remove two existing stone breakwater structures; remove approximately 230 linear feet of existing timber bulkhead and existing riprap; excavate and remove 1,630 square feet of “Phragmites communis” from along the shoreline.

     2.   To construct two stone breakwater structures: one 102 linear feet a maximum distance of 75 feet channelward from the approximate MHW shoreline and one 156 linear feet a maximum distance of 84 feet channewlard from the approximate MHW shoreline. The stone structures will be constructed with a 34 foot wide tidal gap at the base and approximately 50 feet wide between the crest of the structures. 

     3.   To place approximately 2,010 cubic yards of clean sand fill over an approximately 0.40 acre area landward of the two stone breakwater structures. Plant approximately 0.26 acre of native marsh shrubs and herbaceous species. Install temporary exclusion fencing around the planted areas for initial protection and establishment of the planted area.

The purpose of the project is to provide shore erosion control and beach nourishment to restore the Arundel on the Bay community beach.  All proposed work is shown on the enclosed plans dated June 28, 2017.

 If you have any questions concerning this matter, please contact Mr. Richard Kibby at 410-962-0694 or richard.kibby@usace.army.mil.

 The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest.  That decision will reflect the national concern for both protection and utilization of important resources.  The benefit, which reasonable may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments.  All factors, which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economic, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, and consideration of property ownership and in general, the needs and welfare of the people.

 The evaluation of the impacts of the work described above on the public interest will include application of the Clean Water Act 404(b)(1) Guidelines promulgated by the Administrator, U.S. Environmental Protection Agency, under authority of Section 404 of the Clean Water Act.

The Corps of Engineers is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity.  Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal.  To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above.  Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act.  Comments provided will become part of the public record for this action.  Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Written comments concerning the work described above related to the factors listed above or other pertinent factors must be received by the District Engineer, U.S. Army Corps of Engineers, Baltimore District, [Attn: Mr. Richard Kibby, CENAB-OPR-M], 10 S. Howard Street, Baltimore, MD 21201 or richard.kibby@usace.army.mil, within the comment period specified above.

 

 

 

ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act (MSFCMA), as amended by the Sustainable Fisheries Act of 1996 (Public Law 04-267), requires all federal agencies to consult with the National Marine Fisheries Service (NMFS) on all actions, or proposed actions, permitted, funded, or undertaken by the agency that may adversely effect Essential Fish Habitat (EFH).

The project site lies in or adjacent to EFH as described under MSFCMA for windowpane flounder (Scopthalmus aquosos) juvenile and adult; blue fish (Pomatomus saltatrix) juvenile and adult; summer flounder (Paralicthys dentatus) juvenile and adult; and egg, larvae, juvenile and adult stages of red drum (Sciaenops ocellatus), king mackerel (Scomberomorus cavalla), spanish mackerel (Scomberomorus maculates), and cobia (Rachycentron canadum), all managed species under the MSFCMA.

The project has the potential to adversely affect EFH or the species of concern by loss of spawning, nursery, forage and/or shelter habitat as described under the MSFCMA for the species and life stages identified above.  The Baltimore District has made a preliminary determination that site-specific impacts would not be substantial and an abbreviated consultation will be conducted with NMFS.  This determination may be modified if additional information indicates otherwise and would change the preliminary determination.

WATER QUALITY CERTIFICATION: The applicant is required to obtain a water quality certification in accordance with Section 401 of the Clean Water Act from the Maryland Department of the Environment.  Any written comments concerning the work described above which relate to water quality certification must be received by the Maryland Department of the Environment, Tidal Wetlands Division, Montgomery Park Business Center, 1800 Washington Boulevard, Suite 430, Baltimore, Maryland 21230-1708 within the comment period as specified above to receive consideration.  MDE has a statutory limit of one year from the date of this public notice to make its decision.

COASTAL ZONE MANAGEMENT PROGRAMS: The applicant has certified in this application that the proposed activity complies with and will be conducted in a manner consistent with the Maryland Coastal Zone Management Program.  By this public notice, we are requesting the state concurrence or objection to the applicant’s consistency statement.  Public comments relating to consistency must be received by the Maryland Department of the Environment, Tidal Wetlands Division, Montgomery Park Business Center, 1800 Washington Boulevard, Suite 430, Baltimore, Maryland 21230-1708 within the comment period specified above to receive consideration. The MDE has a statutory limit of 6 months to concur or object to the applicant’s consistency determination.

The applicant must obtain any state or local government permits which may be required.

A preliminary review of this application indicates that the proposed work will not affect federally listed threatened or endangered species or their critical habitat, pursuant to Section 7 of the Endangered Species Act, as amended.  As the evaluation of this application continues, additional information may become available which could modify this preliminary determination.

Review of the latest published version of the National Register of Historic Places indicates that no registered properties listed as eligible for inclusion, therein, are located at the site of the proposed work.  Currently unknown archeological, scientific, prehistoric, or historical data may be lost or destroyed by the work to be accomplished under the request permit.

Any person who has an interest which may be adversely affected by the issuance of this permit may request a public hearing.  The request, which must be in writing, must be received by the District Engineer, U.S. Army Corps of Engineers, Baltimore District, [Attn: Mr. Richard Kibby, CENAB-OPR-MN], 10 South Howard Street, Baltimore, Maryland 21201, within the comment period as specified above to receive consideration.  Also it must clearly set forth the interest which may be adversely affected by this activity and the manner in which the interest may be adversely affected.

It is requested that you communicate this information concerning the proposed work to any persons know by you to be interested and not being known to this office, who did not receive a copy of this notice.

 

FOR THE DISTRICT ENGINEER:

 

 

 

 

                                                            Joseph P. DaVia

                                                            Chief, Maryland Section Northern