PN-24-22 NAB-2023-00451-P12 (Hanover Locust Point)

USACE
Published July 24, 2024
Expiration date: 8/23/2024

                       Public Notice

U.S. Army Corps                   In Reply to Application Number
of Engineers                          NAB-2023-00451-P12 (Hanover Locust Point)

Baltimore District
PN-24-22                                 Comment Period: July 24, 2024 to August 23, 2024
THE PURPOSE OF THIS PUBLIC NOTICE IS TO INFORM INTERESTED PARTIES OF THE PROPOSED ACTIVITY AND TO SOLICIT COMMENTS. NO DECISION HAS BEEN MADE AS TO WHETHER OR NOT A PERMIT WILL BE ISSUED AT THIS TIME.

This District has received an application for a Department of the Army permit pursuant to Section 10 of the Rivers and Harbors Act (33 USC 403) and Section 404 of the Clean Water Act (33 USC 1344), as described below:

APPLICANT:

Locust Point York PA Holdings, LLC
1780 South Post Oak Lane
Houston, Texas 77056

WATERWAY AND LOCATION OF THE PROPOSED WORK:

The proposed project is located in and along various tributaries to Poplar Run, on the northwest side of Locust Point Road (SR1021), North, approximately 2,550 feet south of the intersection of Bowers Bridge Road (SR 1013), Conewago Township, York County, Pennsylvania. (40.070536 Latitude/-76.754257 Longitude).

OVERALL PROJECT PURPOSE:

The applicant’s stated purpose is the construction of a 400,000 to 500,000 square foot cross-docked industrial warehouse in York County, within a couple of miles of an interstate highway entrance and exit, on land that is zoned industrial, and has access to public water and sewer; use any excess land available for a 200,000 to 300,000 square foot single-side load industrial warehouse.

PROJECT DESCRIPTION:

Hanover Company is proposing the construction of two industrial warehouses and associated infrastructure on a +/- 67.2-acre project. The plans for this facility include the construction of two industrial warehouses: 423,000 cross-docked warehouse and a 285,200 single-side load warehouse, truck/vehicle parking lots, stormwater management facilities and associated infrastructure.

EFFECTS ON AQUATIC RESOURCES:

Summary of Project Wetlands and Impacts

Wetland

Wetland Size (Sq. Ft.)

Wetland Size (Acres)

Proposed Impacts
(Sq. Ft.)

Proposed Impacts (Acres)

1

16,829

0.39

None

None

2

36,453

0.84

None

None

3

2,935

0.07

None

None

4

2,764

0.06

None

None

5

1,554

0.04

1,554 perm direct

0.04 perm direct

6

12,953

0.30

12,953 perm direct

0.30 perm direct

7

51,681

1.19

39,814 perm direct
1,836 temp

0.91 perm direct
0.04 temp

TOTAL

125,169

+/-2.89

54,321 perm direct
1,836 temp

+/-1.25 perm direct
0.04 temp

 

Summary of Project Streams and Impacts

Stream Channel

Stream Channel Size (linear feet)

Wetland Size
(Acres)

1

+/-720

0

2

+/-2,350

79 perm/93 temp

3

+/-290

218 perm (Waiver #2)

4

+/-322

252 perm (Waiver #2)

TOTAL

3,682

549 perm/93 temp


The+/- 67.2-acre Hanover Locust Point Industrial Park Project area contains seven wetland areas, two perennial stream channels, and two intermittent stream channels. The proposed impacts associated with the Hanover Locust Point Industrial Park Project include 54,321 square feet (1.25 acre) of permanent direct wetland impacts, 1,836 square feet (0.04 acre) of temporary wetland impacts, 6,661 square feet (0.15 acre) of permanent stream channel impacts, 905 square feet (0.02 acre) of temporary stream channel impacts.

LEAD FEDERAL AGENCY:

The United States Army Corps of Engineers, as the lead federal agency, is responsible for all coordination pursuant to applicable federal authorities.

APPLICANT’S PROPOSED AVOIDANCE, MINIMIZATION, AND COMPENSATORY MITIGATION:

The applicant evaluated off-site alternatives, as well as various on-site alignments and their selected alternative, they felt, provides for the least impacts to the aquatic environment while still allowing for the project to full fill their purpose and need.

The applicant has proposed to mitigate for the wetland and stream impacts by purchasing credits from the East Branch of Codorus Creek Mitigation Bank as shown below. 

Resource

Type of Impact

Wetland Impact
(Sq. Ft.)

Wetland Impact (Acres)

Wetland Mitigation Ratio

Mitigation Credits Needed

PEM Wetland

Fill/Permanent

56,628.0

1.25

1:1

1.25

 

Resource

Type of Impact

Stream Impact (Sq. Ft.)

Stream Impact (Acres)

Stream Mitigation Ratio

Mitigation Credits Needed

Stream

Culvert/Permanent

N/A

549.00

1:1

549.00


CORPS EVALUATION REQUIREMENTS:

This project will be evaluated pursuant to Corps Regulatory Program Regulations (33 CFR Parts 320-332). The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economic, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, and consideration of property ownership and in general, the needs and welfare of the people. The evaluation of the impact of this project will also include application of the Clean Water Act Section 404(b)(1) Guidelines promulgated by the Administrator, United States Environmental Protection Agency.

ENDANGERED SPECIES:

A preliminary review of this application indicates that the proposed work is not likely to adversely affect federally listed threatened or endangered species or their critical habitat, pursuant to Section 7 of the Endangered Species Act, as amended. As the evaluation of this application continues, additional information may become available which could modify this preliminary determination.

ESSENTIAL FISH HABITAT:

The Magnuson-Stevens Fishery Conservation and Management Act (MSFCMA), as amended by the Sustainable Fisheries Act of 1996 (Public Law 04-267), requires all federal agencies to consult with the National Marine Fisheries Service on all actions, or proposed actions, permitted, funded, or undertaken by the agency that may adversely affect Essential Fish Habitat (EFH), including species of concern, life cycle habitat, or Habitat Areas of Particular Concern. The project site lies in or adjacent to EFH as described under MSFCMA for managed species under the MSFCMA. The Baltimore District has made a preliminary determination that the project will have no adverse effect on EFH. The Baltimore District has made a preliminary determination that mitigative measures are not required to minimize adverse effects on EFH at this time. This determination may be modified if additional information indicates otherwise.

HISTORIC RESOURCES:

Pursuant to Section 106 of the National Historic Preservation Act of 1966 and applicable guidance, the Corps has reviewed the latest published version of the National Register of Historic Places and initially determined that no registered properties listed as eligible for inclusion, therein, are located at the site of the proposed work. The Corps has made the preliminary determination that the proposed project would have no effect on historic properties. The Corps final eligibility and effect determination will be based on coordination with the State Historic Preservation Office as appropriate and required, and with full consideration given to the proposed undertaking’s potential direct and indirect effects on historic properties within the Corps’ identified permit area.

TRIBAL RESOURCES:

Section 106 of the National Historic Preservation Act also requires federal agencies to consult with federally recognized American Indian tribes that attach religious and cultural significance to historic properties that may be affected by the agency’s undertaking. Corps Tribal Consultation Policy mandates an open, timely, meaningful, collaborative, and effective deliberative communication process that emphasizes trust, respect, and shared responsibility. The policy further emphasizes that, to the extent practicable and permitted by law, consultation works toward mutual consensus and begins at the earliest planning stages before decisions are made and actions taken. The Corps final eligibility and effect determination will be based on coordination with interested tribes, in accordance with the Corps current tribal standard operating procedures as appropriate and required, and with full consideration given to the proposed undertaking’s potential direct and indirect effects on tribal resources.

MODIFICATION OF CIVIL WORKS PROJECTS: 33 USC 408 (SECTION 408):

All Section 408 proposals will be coordinated internally at the United States Army Corps of Engineers. The Section 408 decision will be issued along with the Section 404 and/or Section 10 decision. Please see the following link for more information regarding Section 408:
https://www.nab.usace.army.mil/Missions/Regulatory/Section-408-Requests/.

WATER QUALITY CERTIFICATION:

The applicant is required to obtain a water quality certification in accordance with Section 401 of the Clean Water Act.

COASTAL ZONE MANAGEMENT PROGRAMS:

Where applicable, the applicant has certified in this application that the proposed activity complies with and will be conducted in a manner consistent with the approved Coastal Zone Management Program. By this public notice, we are requesting the State concurrence or objection to the applicant’s consistency statement.

The applicant must obtain any state or local government permits which may be required.

SUBMISSION OF COMMENTS:

The Corps of Engineers is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments provided will become part of the public record for this action and are subject to release to the public through the Freedom of Information Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Written comments concerning the work described above related to the factors listed above or other pertinent factors must be received by the United States Army Corps of Engineers, Baltimore District within the comment period specified above through postal mail at the address below or electronic submission to the project manager email address below. Written comments should reference the Application Number NAB-2023-00451-P12.

PUBLIC HEARING REQUESTS:

Any person who has an interest which may be adversely affected by the issuance of this permit may request a public hearing. The request, which must be in writing, must be received within the comment period as specified above to receive consideration. Also, it must clearly set forth the interest which may be adversely affected by this activity and the manner in which the interest may be adversely affected. The public hearing request may be submitted by electronic mail or mailed to the following address:

Mr. Michael Dombroskie
mike.dombroskie@usace.army.mil
United States Army Corps of Engineers, Baltimore District
Regulatory Branch
1631 South Atherton Street, Suite 101
State College, Pennsylvania 16801

It is requested that you communicate this information concerning the proposed work to any persons known by you to be interested, who did not receive a copy of this notice.

General information regarding the Corps’ permitting process can be found on our website at https://www.nab.usace.army.mil/Missions/Regulatory.aspx. This public notice has been prepared in accordance with Corps implementing regulations at 33 CFR 325.3. If you have any questions concerning this specific project or would like to request a paper copy of this public notice, please contact Mr. Michael Dombroskie at (814) 235-0571 or at mike.dombroskie@usace.army.mil with NAB-2023-00451-P12 in the subject line. This public notice is issued by the Chief, Regulatory Branch.