Regulatory Correspondence

Please submit any correspondence, including compliance certification forms, via email at

NAB-Regulatory@usace.army.mil

or via mail:

U.S. Army Corps of Engineers, Baltimore District
Regulatory Branch (CENAB-OPR)
2 Hopkins Plaza
Baltimore, MD 21201

Customer Service Survey

We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers and would like to know how well we have been doing. 

To access the survey, click here.

Public Notices Overview

A Public Notice is prepared as the primary method of advising all interested parties of a proposed activity for which a permit is sought and of soliciting comments and information necessary to evaluate the probable beneficial and detrimental impacts on the public interest.  Public notices are only prepared for projects determined to exceed minimal individual or cumulative adverse environmental effects and that may be contrary to the public interest.

Submitting Comments:

To send email comments to the respective Project Manager, click on the Project Manager's name below, or contact the Regulatory Branch, U.S. Army Corps of Engineers, Baltimore District, 2 Hopkins Plaza., Baltimore, MD 21201. Comments made in reference to a Public Notice should include your name, address, and phone number. Please be sure to include the Public Notice Number or the Application Number on all correspondence to the District.

Join Our Mailing List!

If you are interested in receiving public notices as part of our mailing list, please fill out the form here and we will add you to our database.

Results:
Tag: Floor Control
Clear
  • PN14-30 Borough of Hyndman Flood Protection - Phase 2

    Expiration date: 6/4/2014

    PN14-30 Comment period May 20, 2014 to June 4, 2014. DESCRIPTION: The project is to repair an existing concrete levee system in Wills Creek and improve flow of the waterway through the town of Hyndman within the flood control area. The proposed repair of the damaged flood control levee includes: 1) the placement of rip rap rock at the foundation of the existing levee; and 2) installation of grade control reinforced concrete cross-vane structures within the stream channel which will serve to stabilize the channel and prevent scour of the stream bed. POC: Deborah Nizer @ 410-962-6085 or by email Deborah.nizer@usace.army.mil

Regulatory Documents

 Title