Regulatory Correspondence

Please submit any correspondence, including compliance certification forms, via email at

NAB-Regulatory@usace.army.mil

or via mail:

U.S. Army Corps of Engineers, Baltimore District
Regulatory Branch (CENAB-OPR)
2 Hopkins Plaza
Baltimore, MD 21201

Customer Service Survey

We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers and would like to know how well we have been doing. 

To access the survey, click here.

Public Notices Overview

A Public Notice is prepared as the primary method of advising all interested parties of a proposed activity for which a permit is sought and of soliciting comments and information necessary to evaluate the probable beneficial and detrimental impacts on the public interest.  Public notices are only prepared for projects determined to exceed minimal individual or cumulative adverse environmental effects and that may be contrary to the public interest.

Submitting Comments:

To send email comments to the respective Project Manager, click on the Project Manager's name below, or contact the Regulatory Branch, U.S. Army Corps of Engineers, Baltimore District, 2 Hopkins Plaza., Baltimore, MD 21201. Comments made in reference to a Public Notice should include your name, address, and phone number. Please be sure to include the Public Notice Number or the Application Number on all correspondence to the District.

Join Our Mailing List!

If you are interested in receiving public notices as part of our mailing list, please fill out the form here and we will add you to our database.

  • PN16-48 (Carpenter IV., R.R.M.) - 2016-60273 - Dorchester Co.

    Expiration date: 9/8/2016

    PN16-46 the comment period is August 17, 2016 to September 8, 2016 – Dorchester County DESCRIPTION: To emplace 6600 linear feet of stone riprap to extend no more than 10 feet channelward of the approximate mean high water shoreline. POC: Mrs. Laura Coleman 443-853-2051 or via email at Lamuelle.l.coleman@usace.army.mil

  • Special PN #16-47

    The purpose of this special public notice is to inform the general public of the Baltimore District, U.S. Army Corps of Engineers (Corps) decision to reinstate the suspended 2012 Nationwide Permit #48 (NWP #48) with revised regional conditions for new and existing commercial shellfish aquaculture activities in Maryland tidal waters. NWP #48 will replace the expiring Regional General Permit-1 (RGP-1) for commercial aquaculture activities. An enclosure to this public notice (Enclosure 1) lists the revised regional conditions applicable to NWP #48 activities in Maryland waters. The reinstated 2012 NWP #48 with revised regional conditions will become effective in Maryland waters on August 16, 2016.

  • PN16-46 (Dunstan, Edmund) - 2015-61421 - Talbot Co.

    Expiration date: 8/30/2016

    PN16-46 the comment period is August 10, 2016 to August 30, 2016 – Talbot County DESCRIPTION: To construct a living shoreline and a stone sill. POC: Mrs. Laura Coleman 443-853-2051 or via email at Lamuelle.l.coleman@usace.army.mil

  • PN16-44 (Baltimore County Dept. of Recreation & Parks Watersedge Park/Revetment) - 2016-60705 - Baltimore County

    Expiration date: 9/5/2016

    PN 16-44 the comment period is August 5, 2016 to September 5, 2016 – Baltimore County DESCRIPTION: Remove 280 cubic yards of existing stone breakwater structure (approximately 130 linear feet) to be reused for reconstruction of new breakwater structures. POC: Mr. Richard Kibby at (410) 962-0694 or by email richard.kibby@usace.army.mil

  • PN16-45 (Pennsylvania Pipelline Project) - 2015-01664

    Expiration date: 8/30/2016

    PN16-45 comment period is August 1, 2016 to August 30, 2016 Description: The purpose of this Public Notice is to solicit comments concerning two proposed pipeline crossings of waters and/or wetland, which require authorization under a Department of the Army Individual Permit. One of the crossings is located in North Middleton Township, Cumberland County, while the second crossing is located in Frankstown Township, Blair County, Pennsylvania. The work is part of the proposed Sunoco Pennsylvania Pipeline Project which extends approximately 254.6 miles from Marcus Hook, Delaware County, Pennsylvania to Delmont, Westmoreland County, Pennsylvania. The Pennsylvania Pipeline Project is to expand the existing pipeline systems, providing transportation of up to 700,000 barrels of natural gas liquids per day, and interconnecting with the existing Sunoco Mariner East pipelines, and involves the installation one 20-inch diameter pipeline and one 16-inch pipeline running parallel to each other for a total distance of 254.6 miles within existing and new right-of-ways. POC: Debby Nizer at 410-962-6085 or by email at debby.nizer@usace.army.mil

Regulatory Documents

 Title