Public Notices Overview

A Public Notice is prepared as the primary method of advising all interested parties of a proposed activity for which a permit is sought and of soliciting comments and information necessary to evaluate the probable beneficial and detrimental impacts on the public interest.  Public notices are only prepared for projects determined to exceed minimal individual or cumulative adverse environmental effects and that may be contrary to the public interest.

Submitting Comments:

To send email comments to the respective Project Manager, click on the Project Manager's name below, or contact the Regulatory Branch, U.S. Army Corps of Engineers, Baltimore District, 2 Hopkins Plaza., Baltimore, MD 21201. Comments made in reference to a Public Notice should include your name, address, and phone number. Please be sure to include the Public Notice Number or the Application Number on all correspondence to the District.

Join Our Mailing List!

If you are interested in receiving public notices as part of our mailing list, please fill out the form here and we will add you to our database.

Results:
Tag: branch
Clear
  • PN 21-18 NAB-2020-60650 (MO DEP Wheaton Branch Dam/SWM Pond) Montgomery County, MD

    Expiration date: 6/4/2021

    The proposed project is to armor 1,859 square feet along 45 linear feet of Wheaton Branch by placing a stone riprap apron below the culvert under Etna Place, to excavate 17,592 cubic yards of material of 66,513 square foot area of the overbank area of Wheaton Branch to provide additional flood storage between Etna Place and Dennis Avenue temporarily impacting 2,391 square feet of area along 503 linear feet of stream, to excavate 20,947 square feet along 367 linear feet within Cell 1 of the Wheaton Branch Stormwater facility by removing 4,000 cubic yards of accumulated sediments. NOTE: This project is being re-noticed to modify the project description to more accurately describe the work to be performed.